Tropical Balinese-style villa designed specifically for paradise life. The villa is located in a quiet side street, a short distance from the main road, but nevertheless within walking distance from many shops, restaurants and massage parlors.
Location:
One of the advantages of the villa is its location, in the immediate vicinity of Nai Harn Beach and Yanui. These are one of the most beautiful beaches in Phuket, with white sand, gentle sea and lots of water activities. Literally ten minutes away is Rawai, which is famous for the largest seafood market on the island.
The presented villa, with an area of 150 square meters and a total area of 341 square meters, includes two spacious bedrooms, each of which is equipped with its own bathroom. The cozy living room with dining area is an ideal place for family evenings and meetings with friends. The whole design is designed in the Balinese style, using a large amount of wood and bamboo. The territory of Vilya is surrounded by a large green garden with a swimming pool so that even on the hottest day, you will feel comfortable.
- 2 bedrooms
- 2 bathrooms
- living room
- dinner zone
- kitchen
- parking area
- garden
- pool
- staff room
A great option for those who want to invest in real estate. Due to its excellent location, the villa will always be in demand for rent.
Features
Available
2 bedrooms
150 m²
341 m²
2007
Ready to move in
Valley
Leasehold
NAI6362
Included in the price
Estate
- Security
House
- Private Pool
- Kitchen
- Dining Room
- Garden
- Car Park
- Living Room
- Furnished
- Terrace
Land
- Road
- Water
- Sewage
- Electricity















































.jpeg)
.jpeg)
.jpeg)
.jpeg)
.jpeg)
.jpeg)
.jpeg)
.jpeg)
.jpeg)
.jpeg)
.jpeg)
.jpeg)
.jpeg)
.jpeg)
.jpeg)
.jpeg)
.jpeg)
.jpeg)

















