$587,392Sale

Bang Tao
Area

3
Bedrooms

3
Bathrooms

157 m²
Living Area

1
Floor

2015
Completion Year

BAN5125: Stunning 3-bedrooms Villa with Private Pool, Bang Tao Beach

This cozy and beautifully designed private pool villa offers a relaxed lifestyle with a touch of sophistication.
All living spaces are thoughtfully planned on one level, making the home practical, comfortable and easy to enjoy day-to-day.
Whether as a permanent residence or a holiday home, this villa creates a welcoming atmosphere from the very first moment.

Location

The villa is situated inside a gated residential community, offering a peaceful environment with 24-hour security. Tropical gardens and well-maintained surroundings add to the sense of calm and privacy.

Design

Natural light flows freely through large glass doors connecting the living room and two bedrooms directly to the swimming pool terrace. 
The private pool measures 2.45 x 6.4 meters and is framed by a stone deck with comfortable sun loungers.
Interior colors include cool blue shades combined with natural wood and light marble with soft dark veining, creating a refreshing and elegant balance.
The master bathroom features mosaic finishes, a separate shower area, and a smooth white bathtub designed for full relaxation.
Storage is well arranged with spacious wardrobes in the kitchen and bedrooms.
A rooftop area is arranged as a peaceful space for meditation, quiet evenings, and quality family time.

Infrastructure

Residents enjoy a secure community with landscaped grounds and a pleasant neighborhood atmosphere.

Ownership Options

Leasehold. Transfer fees and taxes are shared equally between buyer and seller.

Investment Potential

Completed in 2015 and fully furnished, this villa is ready to move in or to be offered for rental income in a well-established residential area.

Additional Details

  • Built-up area 157 sqm.
  • Gross land area 416 sqm.
  • Three bedrooms and three bathrooms.
  • Shared parking.
  • Garden and pool views.

Features

Property Type
Villa & House
Status
Available
Bedrooms
3 bedrooms
Bathrooms
3 bathrooms
Living Area
157 m²
Land Size
416 m²
Completion Year
2015
Floors
1 floor
House State
Ready to move in
Land Type
Valley
Land Title
Chanote
Ownership
Leasehold
Available For
Sale
ID
BAN5125

Included in the price

Estate

  • Security
  • Management
  • Gym

House

  • Private Pool
  • Kitchen
  • Dining Room
  • Maidroom
  • Garden
  • Car Park
  • Living Room
  • Terrace

Land

  • Phoneline
  • Road
  • Water
  • Sewage
  • Electricity
$587,392Sale
1 property attached
OR